![Labuan_02](https://vivata.wizwerx.online/wp-content/uploads/2024/03/Labuan_02.jpg)
![Labuan_03](https://vivata.wizwerx.online/wp-content/uploads/2024/03/Labuan_03.jpg)
![Labuan_04](https://vivata.wizwerx.online/wp-content/uploads/2024/03/Labuan_04.jpg)
Architectural Design
Factory, International Projects, Primary Industry
This Project involved the erection of a new Oil and Gas (O&G) Supply Base comprising a 2-Storey Office Block, Workshops, Covered Storage and other Ancillary structures. ATA Architect’s role involved the Architectural design and the preparation of Site and Building and Interior Plans.